Are you planning exterior work in Montreal?
The City of Montreal's RénoPlex program can provide financial assistance for certain projects. If you're planning to add greenery to your property, improve water management, or repair a driveway, this program can reduce the net cost of your project—provided you meet the criteria and deadlines.

What types of work are eligible?
Exterior landscaping (greening and permeable surfaces)
An example of an acceptable measure is:
10-02 — Laying a plant surface or a honeycomb paver
Specifically, this can include:
Replacing a mineralized surface with a vegetated surface
Install honeycomb paving or a plant stabilizing trellis.
Create a combination of these coatings
Garage entrance
Two positions that are often mentioned:
11-01 — Filling in a garage entrance
11-02 — Re-draining the pit
What technical conditions must be met (exterior layout)?
Regarding outdoor landscaping, the guide specifies, in particular, that:
The portion of the land where mineralized surfaces are removed must represent at least 10 m² .
This area must be excavated and prepared for the installation of:
a vegetated surface
honeycomb paving or a plant stabilizing trellis
a combination of the above coatings.
What subsidy amounts can be mentioned?
Here are some useful amounts to display in an article (depending on the categories indicated in the guide):
10-02 — Vegetated surface or cellular paving: $1,600 per building
11-01 — Filling in a garage entrance: $9,900 per building
11-02 — Re-excavating the pit drainage channel: $165 per linear meter
What is the minimum requirement to submit an application?
The total project amount must be a minimum of $3,000 .
How does the approval process work (and what are the timeframes)?
If the application meets the program requirements, the City informs the person in writing whether the application receives conditional approval or is refused .
The City may request additional information/documents : these must be submitted within 30 days of the date of the notice, otherwise the request is closed .
Eligible work must be completed within 18 months from the date of conditional approval.
If the permit is issued after conditional approval, the 18-month period is postponed by the same number of days, up to a maximum of 24 months after conditional approval.
Upon written request sent before the deadline , the City may extend the deadline once only , for a period of 3 months .
Things to remember before you begin
Amounts and eligibility may vary depending on the building, the borough, and the program conditions. Official validation is required before starting work.
Need help planning your work?
If you wish to replace a mineralized surface with a greener solution (vegetated surface, honeycomb paving) or correct a garage entrance, we can help you evaluate the options , estimate the work and prepare a clear plan .
Need a quote for your outdoor project? Click here
Official source (for more information)
RenoPlex Program Guide — City of Montreal (PDF): https://portail-m4s.s3.montreal.ca/pdf/guide_du_programme_renoplex_fr_20240827_1.pdf?VersionId=MEQZJvTIS0BZXy6FiekUSbxkfB4oMdA